Operation Manual / Power2 850-M / 4.1 Low-pressure stage
4 Disassembly and assembly / 4.11 Installing turbine diffuser and
nozzle ring
© Copyright 2020 ABB. All rights reserved.
HZTL4062_EN
Rev.C
July 2020
3. Tighten screws with torque spanner using the box spanner insert (90770). Observe tight-
ening torque.
4. Screw in a guide stud (90316) in the upper area on the left and right.
5. Secure lifting gear to swivel lifting eye (90231).
(Installation of bracket and plate see
Removing turbine diffuser and nozzle ring
6. Insert turbine diffuser (63000) via the guide studs.
7. Coat a screw (61056) with high-temperature grease and screw in to secure the turbine
diffuser.
Fig. 20: Installing the nozzle ring and turbine diffuser 2
Part number
Thread and tightening torque
61056
M10x90
50 Nm
Table 8: Tightening torque (61056)
1. Remove plates and brackets.
2. Loosen screws (90961) and remove together with star plate (90414). Remove guide
stud (90316).
3. Coat thread of remaining screws (61056) with high-temperature grease and fit screws.
Observe tightening torque.
Page
21
/
43