Press-off screws to be used
Six press-off screws (01) are required to press off the gas outlet flange, which are not sup-
plied by ABB Turbo Systems.
Press-off screws
Product
Thread
Length Quantity
A150-M
M12
30 mm
3 or 6
A155-M
M16
30 mm
3 or 6
Table 34: Press-off screws
Dismantling screw to be used for the optional 6-nozzle turbine cleaning component
A dismantling screw (01) is required to dismantle and fit the cleaning nozzles, which is not
supplied by ABB Turbo Systems.
Dismantling screw
Product
Thread
Length Quantity
A150-M
M8
40 mm
1
A155-M
M10
50 mm
1
Table 35: Dismantling screw