![ABB GOE(2) Installation And Commissioning Manual Download Page 35](http://html.mh-extra.com/html/abb/goe-2/goe-2_installation-and-commissioning-manual_5362035.webp)
Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
35
9.
Remove the bolts (6), the washers (7) and the
lifting tool (1).
G001935
10.
Tighten the draw-rod nut, refer to
Hydraulic tightening of the draw-rod nut,
page
Manual
tightening of the draw-rod nut,
page
End of instruction
4.6 Installation with draw rod at site
4.6.1 Preparations at site
Overview
This procedure is only applicable if the lower draw rod with the bottom contact (36) is installed in the
transformer.
G006891
Summary of Contents for GOE(2)
Page 76: ...76 Installation and commissioning guide 1ZSC000563 ACF EN REV A 2020 06 25 ...
Page 78: ......
Page 79: ......