![ABB GOE(2) Installation And Commissioning Manual Download Page 30](http://html.mh-extra.com/html/abb/goe-2/goe-2_installation-and-commissioning-manual_5362030.webp)
30
Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
3.
Install the winding cables to the bottom contact.
CAUTION!
Make sure that there is no tension in
the winding cables. Tension in the
winding cables will cause damage to
the bottom contact.
G004308
Torque
68 ±6 Nm
4.
Lift the bushing above the opening in the transformer.
5.
Continue with
Installation of the bushing on the transformer,
page
End of instruction
4.5.3 Installation of the large bottom contact in the transformer
Overview
The end-shield can be installed to both the large bottom contact and the bottom nut of the bushing. This
procedure describes installation on the bottom contact. For installation on the bottom nut, refer to
Installation
of the small bottom contact in the transformer,
page
G004296
41 Large bottom contact
Summary of Contents for GOE(2)
Page 76: ...76 Installation and commissioning guide 1ZSC000563 ACF EN REV A 2020 06 25 ...
Page 78: ......
Page 79: ......