Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
17
4 Installation
4.1 Tools
Tool
Part number
Note
Lifting tool
9760 668-C
-
Soft bedding
-
E.g. rubber mat or wood board
Soft lifting slings
-
-
Pull-through cord
9760 669-A
With M8 terminal.
For assembly and disassembly of the
draw rod and draw lead.
Torque wrench key for hexagon head
screws, head width 16 mm (M10) and 13
mm (M8).
-
-
Wrench for hexagon head screws 45 mm
or adjustable wrench for 45 mm bolts
or larger.
-
For the test tap cover.
Shackles
-
To fit Ø 25 mm holes, for connection of
the soft lifting slings to the bushing
flange.
Hydraulic jack
9769 897-A
For removal, and installation of the
bottom contact. Draw-rod system.
Box spanner
9760 669-B
For removal, and installation of the
bottom contact. Draw-rod system.
Tackle
-
For installation of the bushing at a
specific angle.
4.2 Consumables
Item
Brand
ABB part
number
Note
Oil based Vaseline
Fuchs
-
For treatment of contact surfases. Does
not react with transformer oil.
Mobilgrease 28
MOBIL
-
Lubricates and protects metals against
corrosion. Protects rubber. Does not
react with transformer oil.
Molykote Multilub
Dow Corning
-
For lubrication of draw-rod threads and
bolts on the outer terminal.
Thread-locking fluid
grade 42
-
-
High strength thread-locking fluid,
permanent locking.
Thread-locking activator
grade 47
-
-
Activator for thread-locking fluid
grade 42.