74 Maintenance
If you change any wirings or components after the start-up, replace
the FPTC-01 module, modify drive or FSO parameters or restore
parameters to their factory default values, you must:
•
Use only ABB approved spare parts.
•
Register the change to the change log for the safety circuit or
logbook of the machine.
•
Test the safety function again after the change. Obey the rules
given in chapter
•
Document the tests and store the report into
the logbook of the
machine.
Proof test interval
After the operation of the safety function is validated at start-up, the
safety function must be maintained by periodic proof testing. In
high demand mode of operation, the maximum proof test interval is
20 years. In low demand mode of operation, the maximum proof
test interval is 2 years (high or low demand as defined in
IEC 61508, EN/IEC 62061 and EN ISO 13849-1). Regardless of
the mode of operation, it is a good practice to check the operation
of the safety function at least once a year. Do the test as described
in chapter
The person responsible for the design of the complete safety
function should also note the Recommendation of Use
CNB/M/11.050 published by the European co-ordination of Notified
Bodies concerning dual-channel safety-related systems with
electromechanical outputs:
•
When the safety integrity requirement for the safety function is
SIL 3 or PL e (cat. 3 or 4), the proof test for the function must
be performed at least every month.
•
When the safety integrity requirement for the safety function is
SIL 2 (HFT = 1) or PL d (cat. 3), the proof test for the function
must be performed at least every 12 months.
Summary of Contents for FPTC-01
Page 4: ......
Page 12: ...12 Safety ...
Page 23: ...Hardware description 23 Layout 1 1 2 4 3 XSTO2 XSTO1 XWRN XFLT ...
Page 26: ...26 Hardware description ...
Page 27: ...Hardware description 27 ...
Page 28: ...28 Hardware description ...
Page 29: ...Hardware description 29 ...
Page 36: ...Option description and instructions 35 ...
Page 37: ...36 Option description and instructions ...
Page 40: ...Mechanical installation 39 2 3 1 4 ...
Page 41: ...40 Mechanical installation ...
Page 51: ...50 Electrical installation ...
Page 69: ...68 Start up and acceptance test ...
Page 77: ...76 Maintenance ...
Page 79: ...78 Technical data Dimension drawing The dimensions are in millimeters and inches ...
Page 91: ...90 Technical data ...
Page 92: ...Technical data 91 ...
Page 93: ...92 Technical data ...
Page 95: ...94 Technical data ...
Page 97: ...96 Technical data ...
Page 98: ...Technical data 97 ...
Page 99: ...98 Technical data ...
Page 100: ...Technical data 99 ...
Page 101: ...100 Technical data ...
Page 102: ...Technical data 101 ...
Page 103: ...102 Technical data ...
Page 104: ...Technical data 103 ...
Page 105: ...104 Technical data ...
Page 106: ...Technical data 105 ...
Page 108: ...Contact us www abb com drives www abb com drivespartners 3AXD50000027750 Rev C EN 2018 03 23 ...