66 Start-up and acceptance test
Acceptance test
You need the Drive composer PC tool or the control panel to
perform the acceptance test.
Initial status: Make sure that the drive is ready for use, that is, you
have done the tasks of the drive start-up procedure. See the
hardware manual.
Action
WARNING!
Obey the safety instructions. See chapter
. If you ignore the safety instructions injury or death
can occur.
Checks and settings with no voltage connected
The motor manufacturer selects the PTC sensors for the motor
temperature measurement according to the specified temperature
class. Make sure that the temperature on-off resistances match those
of the FPTC module.
After you have done the wiring, check the connections against the
appropriate circuit diagrams and examples in chapter
Electrical
installation
.
Drives with R8i inverter modules: Check that the STO OUT output on
the inverter control unit [A41] is chained to the STO inputs of all
inverter modules. The STO circuit is disabled in spare part modules.
Make sure that the SIL/PL of the safety function meets the target
SIL/PL. If SIL2 is required, make sure that the STO connection
between the FPTC module and drive STO is kept separated.
Settings with voltage connected
Make sure that you have activated the FPTC module in the correct
slot (parameter
35.30
).
Make sure that all parameters relevant to the safety function are set
as defined in chapter
Parameter settings
on page
51
.
Acceptance test procedure
Make sure that you can run and stop the motor freely during the test.
Start drive and make sure that motor is running.
Cause an overtemperature situation:
• increase the resistance in the XFLT input above 3.6 kohm (for
example, open-circuit).
Summary of Contents for FPTC-01
Page 4: ......
Page 12: ...12 Safety ...
Page 23: ...Hardware description 23 Layout 1 1 2 4 3 XSTO2 XSTO1 XWRN XFLT ...
Page 26: ...26 Hardware description ...
Page 27: ...Hardware description 27 ...
Page 28: ...28 Hardware description ...
Page 29: ...Hardware description 29 ...
Page 36: ...Option description and instructions 35 ...
Page 37: ...36 Option description and instructions ...
Page 40: ...Mechanical installation 39 2 3 1 4 ...
Page 41: ...40 Mechanical installation ...
Page 51: ...50 Electrical installation ...
Page 69: ...68 Start up and acceptance test ...
Page 77: ...76 Maintenance ...
Page 79: ...78 Technical data Dimension drawing The dimensions are in millimeters and inches ...
Page 91: ...90 Technical data ...
Page 92: ...Technical data 91 ...
Page 93: ...92 Technical data ...
Page 95: ...94 Technical data ...
Page 97: ...96 Technical data ...
Page 98: ...Technical data 97 ...
Page 99: ...98 Technical data ...
Page 100: ...Technical data 99 ...
Page 101: ...100 Technical data ...
Page 102: ...Technical data 101 ...
Page 103: ...102 Technical data ...
Page 104: ...Technical data 103 ...
Page 105: ...104 Technical data ...
Page 106: ...Technical data 105 ...
Page 108: ...Contact us www abb com drives www abb com drivespartners 3AXD50000027750 Rev C EN 2018 03 23 ...