Electrical installation 31
5
Electrical installation
What this chapter contains
This chapter contains:
•
general cabling instructions
•
instructions on connecting the module to the PROFIBUS DP
network
•
instructions on switching on the bus termination.
WARNING!
Before installation, switch off the drive power
supply. Wait five minutes to ensure that the capacitor bank
of the drive is discharged. Switch off all dangerous
voltages connected from external control circuits to the inputs and
outputs of the drive.
General cabling instructions
•
Arrange the bus cables as far away from the motor cables as
possible.
•
Avoid parallel runs.
•
Use bushings at cable entries.
Summary of Contents for FPBA-01 PROFIBUS DP
Page 4: ......
Page 10: ...10 Table of contents Document library on the Internet 195 ...
Page 20: ...20 About the manual ...
Page 26: ...26 Overview of the PROFIBUS network and the FPBA 01 module ...
Page 30: ...30 Mechanical installation ...
Page 91: ...Start up 91 8 Click Properties Network Settings and set baud rate ...
Page 98: ...98 Start up ...
Page 118: ...118 Communication profiles ...
Page 178: ...178 Diagnostics ...
Page 182: ...182 Technical data ...