I N S T A L L A T I O N P R O C E D U R E S
FOX615
Installation
59
Figure 32:
Earthing / bonding points of the FOX subrack
Legend:
1
Earthing cable
2
Crimp lug for M6 screw
3
Toothed washer for M6 screw
4
Washer for M6 screw
5
Flat head screw M6 x 15 mm (min.)
6
Possible earthing / bonding points on the subrack mounting
flange with M6 screw
7
Left and right mounting rail of the rack
The steps to connect the earthing / bonding point of the FOX subrack to the
local Common Bonding Network are as follows:
5
2
1
7
3
4
6
6
6
6
7
Summary of Contents for FOX615