20
Electrical commissioning
Checking the settings of the auxiliary voltage transformer
(G415)
The connections of the auxiliary voltage transformer
(T10) are made at the factory. Make sure that the
primary and secondary voltages match the desired
voltage level at the site. The terminals are on top of the
transformer.
1-phase power output (option
+G410)
The inverter has a 1-phase power output
available at terminal X63.
•
Voltage selection: 115 or 200 V AC
•
Maximum power: 4 kVA
3-phase power output (option
+G415+G398)
The inverter has a 3-phase power output
available at terminal X62 and the service outlet.
•
Voltage selection: 230 or 400 V AC
•
Maximum power: 10 kVA
•
Can be connected to grounded systems (TN)
3-phase power output (option
+G430)
The inverter has a 3-phase power output for an
auxiliary power transformer when option G430 is
selected.
•
Voltage: Same as inverter output
•
Supplied fuse 63 A/60 A (IEC/UL)
•
Can be connected only to IT (ungrounded)
systems
Connecting temporary external 230/115 V AC supply for control
system during commissioning
With external auxiliary power supply (default):
1. Use the provided power input terminal -X64.
2. You can limit the power consumption by opening the 48 V PSU feeding circuit
breakers. Close only -F12 to activate the control boards and communication modules.
3. Close switch -Q64.
-PE
-X
3
PE
L
N
-PE
-X
2
PE
L1
L2
L3
Summary of Contents for Fimer PVS980-58-4348kVA-I
Page 1: ...Central inverter PVS980 58 From 4348 to 5000 kVA Commissioning and maintenance manual ...
Page 4: ...2 ...
Page 16: ...14 Safety instructions ...
Page 20: ...18 Introduction to the manual ...
Page 26: ...24 Electrical commissioning ...
Page 56: ...54 Maintenance ...