42/24-30 EN Rev. 1
EL6010 Gas Analyzer in Category 2G Operator’s Manual
19
Connection Analyzer Unit – Control Unit,
continued
Step Action
1
Remove the cap nut from the metallic cable connector and remove
the plastic insert and seal ring.
2
Strip the outer cover from approx. 10 mm of the cable.
3
Slide the cap nut
1
, seal ring
2
and plastic insert
3
over the cable
4
.
1
2
3
4
5
6
4
Bend the shield braid
5
outward and fold it back over the plastic
insert
3
.
5
Push the cable into the intermediate opening
6
in the metallic cable
connector until the braid touches the opening and then push it in and
out several times.
6
Push the non-rotating plastic insert
3
and seal ring
2
in the inter-
mediate opening
6
until it engages.
7
Securely tighten the cap nut
1
.
Connecting the
Shielded Data Trans-
mission and 24-VDC
Connection Cables to
the Control Unit
8
Connect the data transmission and 24-VDC connection cable leads
according to their respective numbers to terminals 1 to 12 and 13 to 15
(see connection diagram, page 17).
Further Electrical Connections
Step Action
1
Remove the cap nut on the threaded connector and remove both seal
rings.
2
Slide the cap nut
1
and seal rings over the cable.
6-8 mm OD Cable: Use seal rings
2
and
3
.
8-12 mm OD Cable: Use seal ring
2
only.
1
2
3
4
3
Pass the cable through the intermediate openings
4
in the connection
box.
Inserting Cables in the
Connection Box
4
Tighten cap nut
1
(torque to 2.5 Nm).