Winder commissioning
Before starting the winder commissioning the operation modes of the winder as well as the directions of speed
and torque have to be defined clearly as described in the following.
This has to be checked during commissioning:
n
Speed
= Rotating direction of the mandrell in speed control.
The speed reference is positive, no winder on command -
see WinderOnCmd (61.06) - and WinderMacro (61.01) =
NotUsed.
To change the speed direction swap the field cables at F1
and F2. Additionally swap the analog tacho cables or the
encoder tracks A+ and A- respectively.
See diagram above:
n
speed
or n
speed
V+ = Direction of the velocity reference for the whole plant.
Always considered positive, see SpeedRef3 (2.02).
See diagram above:
V+ V+
or
Summary of Contents for DCS550 Series
Page 1: ... DCS550 Manual DCS550 Drives 20 A to 1000 A ...
Page 141: ...141 Winder 3ADW000379R0501 DCS550 Manual e e ...
Page 143: ...143 Winder 3ADW000379R0501 DCS550 Manual e e ...
Page 145: ...145 Winder 3ADW000379R0501 DCS550 Manual e e ...
Page 147: ...147 Winder 3ADW000379R0501 DCS550 Manual e e ...