Siting the analytical unit
Since the CoreSense M10 analytical unit can be installed on the transformer wall or a wall adjacent
to the transformer, there are a few physical limitations to take into account before installing the
CoreSense M10 analytical unit.
Clearance requirements
You need to make sure that you have enough room to install the unit. You need enough clearance to be
able to install the unit mount properly, and also enough clearance to be able to fully open the unit door.
Below are the clearance requirements for the analytical unit.
—
Figure 12
CoreSense M10 analytical unit dimensions and clearance requirements (in mm)
(770.4)
(924.8)
(335.3)
(881)
(771)
Summary of Contents for CoreSense M10
Page 1: ... INSTALL ATION GUIDE CoreSense M10 Multi gas monitoring system ...
Page 18: ...Page intentionally left blank ...
Page 26: ...Page intentionally left blank ...
Page 34: ...Page intentionally left blank ...
Page 42: ...Page intentionally left blank ...
Page 62: ...Page intentionally left blank ...
Page 70: ...Page intentionally left blank ...
Page 82: ...Page intentionally left blank ...
Page 88: ...Page intentionally left blank ...
Page 93: ......
Page 94: ......
Page 95: ......