point, make sure that you have already created and configured
the event and scale objects.
One instance of IEC 61850 OPC Server is always mandatory.
For more detailed information on adding objects to the object tree, refer to the appropriate
protocol manual (see 1.10, Related documents).
Substation structure for HMI
6.4.2.3.
Configuring the substation is the main task in configuring HMI functionality. If connectiv-
ity packages or IED SCL description files with substation structure information are used,
most of the substation structure can be built automatically when the IEDs are added to
the communication structure. If no substation structure information is available the
structure must be built manually.
Before you can create a substation structure, you have to create
a communication structure with OPC Server and communica-
tion channel objects, IEDs, Logical Devices, Logical Nodes
and Data objects.
For more detailed information, see COM600 HMI Configuration Manual.
OPC clients
6.4.2.4.
The object tree is built in the communication structure. Before an OPC client can be
taken into use, confgure an OPC server for the process communication.
52
1MRS756125
COM600 series, version 4.1
User's Manual
Summary of Contents for COM600 series
Page 1: ...COM600 series version 4 1 User s Manual...
Page 2: ......
Page 6: ...6...
Page 103: ......