
Creating your first
circuit diagram
83
1SVC 440 795 M1100
Starting point: Status display
When you switch on the display system it opens the status
display immediately. This shows the switching state of the
inputs and outputs and also indicates whether the display
system is already running a program.
Note:
If another
display is showing, this means that a visualization screen is
displayed.
X
Press
OK
to switch to the main menu.
Press
OK
to switch to the next menu level, and press
ESC
to
move one level back.
The display system must be in STOP mode.
X
Press
OK
2 × to enter the circuit diagram display via menu
items PROGRAM…
h
PROGRAM. This is where you will
create the circuit diagram.
I ............
I
P-
MO 02:00
Q........
STOP
h
The examples were written without the use of expansion
units. If an expansion unit is connected, the status display
will first show the status of the display system and then
the status of the expansion unit before showing the first
selection menu.
PROGRAM...
STOP å RUN
PARAMETER
SET CLOCK...
h
OK
has two other functions:
• Press
OK
to save modified settings.
• In the circuit diagram, you can also press
OK
to insert
and modify contacts and relay coils.
CIRCUIT DIAGRAM
FUNCTION RELAYS
Summary of Contents for CL Series
Page 1: ... APPLICATION MANUAL Display system CL range ...
Page 115: ...112 1SVC 440 795 M1100 ...
Page 345: ...342 1SVC 440 795 M1100 ...
Page 427: ...1SVC 440 795 M1100 424 ...