Basic Steps
NOTE
Please refer to the planning documents for the installation. Please also
refer to the technical data (see chapter "Technical Data" on page 27).
Step Action
1
Unpack the supplied parts (see section "Unpacking" on page 7).
2
If required, assemble or shorten the sample gas line (only types
CGWB 13 and TBL 01-C, see section "Assembling or Shortening
the Heatable Sample Gas Line" on page 8).
3
Install the heatable sample gas line (see section "Laying the Heatable
Sample Gas Line Correctly" on page 13).
4
Carry out the electrical connection (see section "Requirements and
Procedures for Electrical Connection" on page 17).
After you have carried out these steps, the sample gas line is operative.
Guide for the Installation