
22
GAA610-M
ADVANCED EMISSION GAS MONITORING SYSTEM | OI/GAA610-M-EN REV. B
… 5 Preparation for Installation
… Dimensions
Type 40 probe tube and filter unit
A
Type 40 probe tube
B
Heated filter unit
1
Backpurging air inlet from solenoid valve S0V2
2
Backpurging air inlet from solenoid valve S0V1
3
Sample gas outlet (heated sample gas line)
4
Cable gland for heated filter unit power supply
5
Cable gland for heated filter unit alarm signal
L1 500 mm (19.7 in) / 1000 mm (39.4 in)
Figure 9: Type 40 probe tube and filter unit