![ABB Arc Guard System TVOC-2 Installation And Maintenance Manual Download Page 34](http://html.mh-extra.com/html/abb/arc-guard-system-tvoc-2/arc-guard-system-tvoc-2_installation-and-maintenance-manual_3045239034.webp)
Installation
32
Connecting opti-
cal detectors
Follow this steps below to connect the optical detectors to the Arc Monitor.
Warning!
Make sure that supply voltage is switched off!
1. Remove the protection plug.
Note!
Only remove protection plug from connection to use. Protection plugs are
needed to protect the detector inputs from dust and light.
2. Connect optical detectors to lower side of arc monitor. Detector inputs are
X1:1-10 (for Extension 1, X2:1-10 and Extension 2, X3:1-10)
2
1
Summary of Contents for Arc Guard System TVOC-2
Page 1: ...Arc Guard System TVOC 2 Installation and maintenance guide ...
Page 2: ......
Page 8: ...6 ...
Page 10: ...About Arc Guard System 8 ...
Page 54: ...Installation 52 ...
Page 74: ...Human Machine Interface functions 72 ...
Page 82: ...Technical data 80 ...
Page 89: ......