Miscellaneous
■
Cable duct in the floor below the cabinet
You can construct cable ducts below the cabinet. The duct width must not exceed 450 mm
(18 in). The cabinet weight lies on the 100 mm (4 in) wide sections in front, middle and back
which the floor must carry.
Prevent the cooling air flow from the cable duct to the cabinet by bottom plates. To ensure
the degree of protection for the cabinet use the original bottom plates delivered with the
converter. With user-defined cable entries, take care of the degree of protection, fire
protection and EMC compliance.
■
Electric welding
It is not recommended to fasten the cabinet by welding. If you must do it for some reason:
• Weld only the flat bar under the cabinet, never the cabinet frame itself.
• Clamp the welding electrode onto the flat bar about to be welded or to the next flat bar
of the cabinet (within 0.5 meters (1’6”) of the welding point).
WARNING!
If the welding return wire is connected improperly, the welding circuit may damage
electronic circuits in the cabinet. The thickness of the zinc coating of the cabinet
frame is 100…200 micrometers; on the flat bars the coating is approximately
20 micrometers. Ensure that the welding fumes are not inhaled.
Mechanical installation 47
10
Summary of Contents for ACS880-87LC-3200A
Page 2: ......
Page 4: ......
Page 10: ...10 ...
Page 18: ...5 1 3 4 6 8 7 2 18 Safety instructions ...
Page 48: ...48 ...
Page 68: ...68 ...
Page 75: ...b 3 a 2 6 c 4 Air flow direction is towards the converter module Maintenance 75 ...
Page 85: ...14 Open the installation stand optional and place it in front of the module 14 Maintenance 85 ...
Page 108: ...108 ...
Page 112: ...Description CAN bus connection XCAN XCAN 112 BCU x5 control unit ...
Page 116: ...116 Dimension drawings ...
Page 117: ...Dimension drawings 117 ...
Page 118: ...118 Dimension drawings ...
Page 130: ...130 ...