Opening and disconnecting the main circuit breaker
These instructions are for the qualified electricians who do work on the converter, generator
cable or generator.
WARNING!
If you are not a qualified electrician, do not proceed or do any installation or
maintenance work.
1.
Undo the two fastening screws of the main circuit breaker (Q1) cover.
2.
Open the cover.
3.
Open the cover of the red push button.
4.
Push the red push button (“Push OFF”).
5.
Close both covers in front of the push buttons.
6.
Lock the covers with a padlock. Put the key(s) in a safe place.
7.
Make sure that the OPEN/CLOSED indicator shows OPEN.
8.
Write your name, phone number and the date to the “Do not switch on. Men at work”
warning sign and hang the warning sign on the main circuit breaker.
16 Safety instructions
3
Summary of Contents for ACS880-77CC
Page 1: ...ABB WIND TURBINE CONVERTERS ACS880 77CC wind turbine converters Hardware manual...
Page 2: ......
Page 4: ......
Page 10: ...10...
Page 17: ...5 1 3 4 6 8 7 2 Safety instructions 17...
Page 22: ...22...
Page 40: ...40...
Page 60: ...60...
Page 73: ...2a 3b 4c 5 Air flow direction is towards the converter module Maintenance 73...
Page 104: ...104...
Page 108: ...Description CAN bus connection XCAN XCAN 108 BCU x5 control unit...
Page 112: ...112 Dimension drawings...
Page 113: ...Dimension drawings 113...
Page 114: ...114 Dimension drawings...
Page 126: ...126...