Tasks
Validate the operation of safety functions (for example, emergency stop).
WARNING!
The safety functions are not safe before they are validated according to the instructions. Safety
functions are optional. See the function-specific manual for the validation tasks.
Switching the supply unit off
1.
Stop the motors connected to inverter units.
2.
Deactivate the Run enable signal to open the main circuit breaker [Q1]. This can be
done, for example, with an operating switch [S21].
Additional instructions for closing the DC
switch-disconnector
If the DC bus is not alive and the main DC switch-disconnector [Q11] is in OFF position, the
main DC switch-disconnector [Q11] is mechanically locked to OFF position by interlock
[K11]. In order to get the supply unit started there are two possibilities: the DC bus is powered
up by another supply unit (if applicable), or the DC bus must be powered by means of the
local charging control switch [S4], which forces the charging circuit on.
IGBT supply modules can then be charged as follows:
Note:
Before local operation of the charging circuit via local charging control switch [S4], make
sure that the main breaker(s) of the supply unit is racked in and the DC switch-disconnector
for line-up charging [Q40] is closed.
•
Force the charging circuit of the unit on via setting the local charging control switch [S4]
to position “1”.
•
Wait for a few seconds for the DC bus charging up to nominal voltage level.
•
Charge the IGBT supply modules: close the charging switch [Q10] of the units that are
to be powered up.
•
After the IGBT supply modules are charged and the charging light [P11] on the cabinet
door illuminates, the lock of DC switch-disconnector [Q11] is released. The main DC
switch-disconnector [Q11] can now be closed, and the charging switch [Q10] opened.
•
Repeat this for all IGBT supply module cubicles belonging to this supply unit.
•
After that, set the local charging control switch [S4] back into OPEN position and the
DC bus will be discharged again.
When the DC switch-disconnector [Q11] is in ON position, follow the normal start-up
procedure to charge the line-up and to start the operation of the supply unit.
120 Start-up
Summary of Contents for ACS880-204LC
Page 1: ... ABB INDUSTRIAL DRIVES ACS880 204LC IGBT supply modules Hardware manual ...
Page 2: ......
Page 4: ......
Page 16: ...16 ...
Page 32: ...32 ...
Page 39: ...Overview of kits Cabinet construction 39 ...
Page 40: ...Stage 1 Installation of common parts 40 Cabinet construction ...
Page 41: ...Stage 2 Installation of LCL side plates and common AC bus Cabinet construction 41 ...
Page 42: ...Stage 3 Installation of brackets for Flat PLS holder 42 Cabinet construction ...
Page 43: ...Stage 4A BLCL 15LC 7 AC connection and fuse busbars installation Cabinet construction 43 ...
Page 44: ...Stage 4B BLCL 24LC 7 AC connection and fuse busbars installation 44 Cabinet construction ...
Page 46: ...Stage 6 LCL choke and LCL choke busbar installation 46 Cabinet construction ...
Page 50: ...Stage 9 Installation of LCL shroud kit 50 Cabinet construction ...
Page 52: ...Overview of kits 52 Cabinet construction ...
Page 53: ...Stage 1 Installation of common parts Cabinet construction 53 ...
Page 54: ...Stage 2 Installation of LCL side plates and common AC bus 54 Cabinet construction ...
Page 55: ...Stage 3 Installation of brackets for Flat PLS holder Cabinet construction 55 ...
Page 56: ...Stage 4 AC connection and fuse busbars installation 56 Cabinet construction ...
Page 58: ...Stage 6 LCL choke and LCL choke busbar installation 58 Cabinet construction ...
Page 61: ...Stage 9 Installation of LCL shroud kit Cabinet construction 61 ...
Page 65: ...Overview of kits Cabinet construction 65 ...
Page 66: ...Stage 1 Installation of common parts 66 Cabinet construction ...
Page 67: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 67 ...
Page 68: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 68 Cabinet construction ...
Page 69: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 69 ...
Page 70: ...Stage 5A Installation of DC busbars 70 Cabinet construction ...
Page 72: ...Stage 6 Module installation 72 Cabinet construction ...
Page 73: ...Stage 7 Installation of shrouding Cabinet construction 73 ...
Page 77: ...Overview of kits Cabinet construction 77 ...
Page 78: ...Stage 1 Installation of common parts 78 Cabinet construction ...
Page 79: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 79 ...
Page 80: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 80 Cabinet construction ...
Page 81: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 81 ...
Page 82: ...Stage 5A Installation of DC busbars 82 Cabinet construction ...
Page 84: ...Stage 6 Module installation 84 Cabinet construction ...
Page 85: ...Stage 7 Installation of shrouding Cabinet construction 85 ...
Page 89: ...Overview of kits Cabinet construction 89 ...
Page 90: ...Stage 1 Installation of common parts 90 Cabinet construction ...
Page 91: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 91 ...
Page 92: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 92 Cabinet construction ...
Page 93: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 93 ...
Page 94: ...Stage 5A Installation of DC busbars 94 Cabinet construction ...
Page 96: ...Stage 6 Module installation 96 Cabinet construction ...
Page 97: ...Stage 7 Installation of shrouding Cabinet construction 97 ...
Page 98: ...98 ...
Page 114: ...114 ...
Page 125: ...a b c Maintenance 125 ...
Page 180: ...180 ...
Page 206: ...206 ...
Page 208: ...Frame R8i module 208 Dimension drawings ...
Page 209: ... Quick connector Dimension drawings 209 ...
Page 210: ...LCL filter components Grid side choke BLCL 15LC 7 and BLCL 24LC 7 210 Dimension drawings ...
Page 211: ... Grid side choke BLCL 25LC 7 Dimension drawings 211 ...
Page 212: ... Converter side choke BLCL 15LC 7 and BLCL 24LC 7 212 Dimension drawings ...
Page 213: ... Converter side choke BLCL 25LC 7 Dimension drawings 213 ...
Page 214: ... Capacitor www tdk electronics tdk com 214 Dimension drawings ...
Page 276: ...276 ...