Electrical safety precautions
These electrical safety precautions are for all personnel who do work on the drive, motor
cable or motor.
WARNING!
Obey these instructions. If you ignore them, injury or death, or damage to the
equipment can occur.
If you are not a qualified electrician, do not do installation or maintenance work.
Go through these steps before you begin any installation or maintenance work.
1.
Keep the cabinet doors closed when the drive is powered. With the doors open, a risk
of a potentially fatal electric shock, arc flash or high-energy arc blast exists.
2.
Clearly identify the work location and equipment.
3.
Disconnect all possible voltage sources. Lock out and tag out.
•
Open the main disconnecting device of the drive.
•
Open the charging switch if present.
•
Open the disconnector of the supply transformer. (The main disconnecting device
in the drive cabinet does not disconnect the voltage from the AC input power busbars
of the drive cabinet.)
•
If the drive is equipped with a DC/DC converter unit (optional): Open the DC
switch/disconnector ([Q11], F286) of the DC/DC converter. Open the
disconnecting device of the energy storage connected to the DC/DC converter unit
(outside the drive cabinet).
•
Open the auxiliary voltage switch-disconnector (if present), and all other possible
disconnecting devices that isolate the drive from dangerous voltage sources.
•
In the liquid cooling unit (if present), open the motor protective circuit breaker(s) of
the cooling pumps.
•
If you have a permanent magnet motor connected to the drive, disconnect the motor
from the drive with a safety switch or by other means.
•
Make sure that re-connection is not possible. Lock out and tag out.
•
Disconnect any dangerous external voltages from the control circuits.
•
After you disconnect power from the drive, always wait 5 minutes to let the
intermediate circuit capacitors discharge before you continue.
4.
Protect any other energized parts in the work location against contact.
5.
Take special precautions when close to bare conductors.
6.
Measure that the installation is de-energized. If the measurement requires removal or
disassembly of shrouding or other cabinet structures, obey the local laws and regulations
applicable to live working (including – but not limited to – electric shock and arc
protection).
•
Use a multimeter with an impedance greater than 1 Mohm.
•
Make sure that the voltage between the drive input power terminals (L1, L2, L3)
and the grounding (PE) busbar is close to 0 V.
•
Make sure that the voltage between the drive DC busbars (+ and -) and the
grounding (PE) busbar is close to 0 V.
•
If you have a permanent magnet motor connected to the drive, make sure that the
voltage between the drive output terminals (T1/U, T2/V, T3/W) and the grounding
(PE) busbar is close to 0 V.
100 Electrical installation
Summary of Contents for ACS880-204LC
Page 1: ... ABB INDUSTRIAL DRIVES ACS880 204LC IGBT supply modules Hardware manual ...
Page 2: ......
Page 4: ......
Page 16: ...16 ...
Page 32: ...32 ...
Page 39: ...Overview of kits Cabinet construction 39 ...
Page 40: ...Stage 1 Installation of common parts 40 Cabinet construction ...
Page 41: ...Stage 2 Installation of LCL side plates and common AC bus Cabinet construction 41 ...
Page 42: ...Stage 3 Installation of brackets for Flat PLS holder 42 Cabinet construction ...
Page 43: ...Stage 4A BLCL 15LC 7 AC connection and fuse busbars installation Cabinet construction 43 ...
Page 44: ...Stage 4B BLCL 24LC 7 AC connection and fuse busbars installation 44 Cabinet construction ...
Page 46: ...Stage 6 LCL choke and LCL choke busbar installation 46 Cabinet construction ...
Page 50: ...Stage 9 Installation of LCL shroud kit 50 Cabinet construction ...
Page 52: ...Overview of kits 52 Cabinet construction ...
Page 53: ...Stage 1 Installation of common parts Cabinet construction 53 ...
Page 54: ...Stage 2 Installation of LCL side plates and common AC bus 54 Cabinet construction ...
Page 55: ...Stage 3 Installation of brackets for Flat PLS holder Cabinet construction 55 ...
Page 56: ...Stage 4 AC connection and fuse busbars installation 56 Cabinet construction ...
Page 58: ...Stage 6 LCL choke and LCL choke busbar installation 58 Cabinet construction ...
Page 61: ...Stage 9 Installation of LCL shroud kit Cabinet construction 61 ...
Page 65: ...Overview of kits Cabinet construction 65 ...
Page 66: ...Stage 1 Installation of common parts 66 Cabinet construction ...
Page 67: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 67 ...
Page 68: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 68 Cabinet construction ...
Page 69: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 69 ...
Page 70: ...Stage 5A Installation of DC busbars 70 Cabinet construction ...
Page 72: ...Stage 6 Module installation 72 Cabinet construction ...
Page 73: ...Stage 7 Installation of shrouding Cabinet construction 73 ...
Page 77: ...Overview of kits Cabinet construction 77 ...
Page 78: ...Stage 1 Installation of common parts 78 Cabinet construction ...
Page 79: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 79 ...
Page 80: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 80 Cabinet construction ...
Page 81: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 81 ...
Page 82: ...Stage 5A Installation of DC busbars 82 Cabinet construction ...
Page 84: ...Stage 6 Module installation 84 Cabinet construction ...
Page 85: ...Stage 7 Installation of shrouding Cabinet construction 85 ...
Page 89: ...Overview of kits Cabinet construction 89 ...
Page 90: ...Stage 1 Installation of common parts 90 Cabinet construction ...
Page 91: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 91 ...
Page 92: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 92 Cabinet construction ...
Page 93: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 93 ...
Page 94: ...Stage 5A Installation of DC busbars 94 Cabinet construction ...
Page 96: ...Stage 6 Module installation 96 Cabinet construction ...
Page 97: ...Stage 7 Installation of shrouding Cabinet construction 97 ...
Page 98: ...98 ...
Page 114: ...114 ...
Page 125: ...a b c Maintenance 125 ...
Page 180: ...180 ...
Page 206: ...206 ...
Page 208: ...Frame R8i module 208 Dimension drawings ...
Page 209: ... Quick connector Dimension drawings 209 ...
Page 210: ...LCL filter components Grid side choke BLCL 15LC 7 and BLCL 24LC 7 210 Dimension drawings ...
Page 211: ... Grid side choke BLCL 25LC 7 Dimension drawings 211 ...
Page 212: ... Converter side choke BLCL 15LC 7 and BLCL 24LC 7 212 Dimension drawings ...
Page 213: ... Converter side choke BLCL 25LC 7 Dimension drawings 213 ...
Page 214: ... Capacitor www tdk electronics tdk com 214 Dimension drawings ...
Page 276: ...276 ...