Preparing the cable ends and making 360-degree grounding at the
cable entry
1. Peel off 3…5 cm (1 1/4 … 2 in) of the outer insulation of the cables at the cable entries
with the conductive sleeves for the 360° high-frequency grounding.
2. Prepare the ends of the cables.
PE
PE
WARNING!
Apply grease to stripped aluminum conductors before attaching them to
non-coated aluminum cable lugs. Obey the grease manufacturer’s instructions.
Aluminum-aluminum contact can cause oxidation in the contact surfaces.
3. If fire insulation is used, make an opening in the mineral wool sheet according to the
diameter of the cable.
4. Put the cables through the entry plate.
104 Electrical installation
Summary of Contents for ACS880-14
Page 1: ...ABB INDUSTRIAL DRIVES ACS880 14 drive modules 132 400 kW 200 400 hp Hardware manual...
Page 2: ......
Page 4: ......
Page 14: ...14...
Page 24: ...24...
Page 30: ...30...
Page 54: ...54...
Page 64: ...64...
Page 98: ...98...
Page 114: ...With twin connectors in the control panel holder 1 2 3 1 114 Electrical installation...
Page 115: ...With FDPI 02 modules OPEN TERMIN ATED 1 1 2 2 OPEN TERMINATED 3 Electrical installation 115 11...
Page 142: ...4 5 6 3 3 1 1 1 1 2 142 Installation example with full cabling panels option H381...
Page 150: ...150 Installation example with full cabling panels option H381...
Page 156: ...156...
Page 204: ...Standard configuration 204 Dimension drawings...
Page 206: ...Drive module with options 0B051 H356 0H371 206 Dimension drawings...
Page 207: ...Configuration with option H381 3AXD50000323210 Dimension drawings 207...
Page 208: ...LCL filter module 208 Dimension drawings...
Page 212: ...External control unit 3AXD50000011687 212 Dimension drawings...
Page 230: ...Declaration of conformity 230 The Safe torque off function...
Page 241: ...241...
Page 246: ...246...