![ABB ACS880-01 Series Firmware Instructions Download Page 74](http://html.mh-extra.com/html/abb/acs880-01-series/acs880-01-series_firmware-instructions_2621074.webp)
74 Program features
Follower settings:
• Master/follower link activation
•
(fiber optic channel or XD2D selection)
•
= 2…60
•
(for both fiber optic and wire connection)
•
for fiber optic,
for wire)
• Mapping of data received from master
•
•
•
• Selection of operating mode and control location
•
=
•
•
• Selection of reference sources
•
•
=
• Selection of data to be sent to master (optional)
•
•
•
Specifications of the fiber optic master/follower link
• Maximum fiber optic cable length:
•
FDCO-01/02 or RDCO-04 with POF (Plastic Optic Fiber): 30 m
•
FDCO-01/02 or RDCO-04 with HCS (Hard-clad Silica Fiber): 200 m
•
For distances up to 1000 m, use two NOCR-01 optical converter/repeaters
with glass optic cable (GOF, 62.5 micrometers, Multi-Mode)
• Maximum shielded twisted-pair cable length: 50 m
• Transmission rate: 4 Mbit/s
• Total performance of the link: < 5 ms to transfer references between the master
and followers.
• Protocol: DDCS (Distributed Drives Communication System)
Settings and diagnostics
Parameter groups
(page
(page
) and
(page
).
Summary of Contents for ACS880-01 Series
Page 1: ...ABB industrial drives Firmware manual ACS880 ESP control program option N5600 ...
Page 4: ......
Page 12: ...12 Table of contents ...
Page 20: ...20 Introduction to the manual ...
Page 22: ...22 Using the control panel ...
Page 28: ...28 Control locations and operating modes ...
Page 146: ...146 Application macros ...
Page 502: ...502 Parameters ...
Page 606: ...606 Fault tracing ...
Page 662: ...662 Control chain diagrams ...