Mechanical installation 49
Joining the liquid cooling unit to the converter cabinet
Converter delivery does not include the liquid cooling unit (LCU) that is to be connected to
the converter cabinet.
Connecting the liquid pipes
Note:
It is recommended to use closing valves in the pipe connections of the cooling
circuit.
1. Ensure that there is sufficient space and free access to make proper cooling pipe
connections between the liquid cooling unit and the converter. It is not allowed to use
inflexible and fixed cooling pipe connections between two separate units (eg, LCU and
the converter connection). Always use a flexible connector that can reduce possible
stress caused by eg, vibration.
2. Check visually that the converter liquid pipes are not damaged (threads and flange
joint not damaged).
3. Connect the external cooling circuit pipes to the LCU. Secure the pipes mechanically.
See chapter
for the pipe materials.
4. Position the liquid pipe ends against each other.
5. Centre the connector onto the pipe ends.
6. Tighten the
•
threaded connector carefully and ensure that it is slid on pipe ends,
•
flange connector bolts to a torque of 70 N·m (52 lbf·ft).
Customer support
L bracket
M16 bolt
Cabinet
roof
Customer support
Summary of Contents for ACS800-67LC
Page 1: ... ABB WIND TURBINE CONVERTERS ACS800 67LC wind turbine converters Hardware manual ...
Page 4: ......
Page 16: ...16 Safety instructions ...
Page 22: ...22 Introduction to the manual ...
Page 42: ...42 Operation principle and hardware description ...
Page 52: ...52 Mechanical installation ...
Page 79: ...Electrical installation 79 3 3 Rotor side cable connection terminals U2 V2 W2 ...
Page 92: ...92 Maintenance 4 6 5 5 ...
Page 103: ...Maintenance 103 Bussmann fuses Mersen fuses ...
Page 109: ...Maintenance 109 5 6 7 ...
Page 131: ...Technical data 131 Declaration of incorporation ...
Page 136: ...136 Dimension drawings ACS800 67LC 1075 0575 7 and 1375 0575 7 ...
Page 137: ...Dimension drawings 137 With 400 mm wide incoming cubicle option C111 ...
Page 138: ...138 Dimension drawings ACS800 67LC 1375 1125 7 ...
Page 139: ...Dimension drawings 139 With 400 mm wide incoming cubicle option C111 ...
Page 140: ...140 Dimension drawings ACS800 67LC 1595 0865 7 and 2035 1125 7 ...
Page 141: ...Dimension drawings 141 With 400 mm wide incoming cubicle option C111 ...
Page 143: ...Dimension drawings 143 Options 2H370 and C111 Option 1H371 ...
Page 144: ...144 Dimension drawings Options 1H371 and C111 Options 2H371 and C111 ...
Page 145: ...Dimension drawings 145 Option H378 Options H378 and C111 ...
Page 147: ...Dimension drawings 147 Option 2H372 ...
Page 148: ...148 Dimension drawings Option 3H372 ...
Page 149: ...Dimension drawings 149 Option 1H373 ...
Page 150: ...150 Dimension drawings Option 2H373 ...
Page 151: ...Dimension drawings 151 Option 3H373 ...