44 Mechanical installation
Required tools
The tools required for moving the unit to its final position, fastening it to the floor and
tightening the connections are listed below:
•
crane, fork-lift or pallet truck (check load capacity!), iron bar and jack
•
Pozidrive and Torx (2.5…6 mm) screwdrivers for the tightening the frame screws
•
torque wrench
•
set of wrenches or sockets.
Unpacking
Unpack and move the unit according to the instructions given in section
.
Checking the delivery
The converter delivery contains:
•
converter cabinet
•
options (if ordered) installed at the factory
•
installation stand for the converter module replacement (if ordered)
•
lifting bars.
Following equipment are located in the floor of the inverter module cubicle:
•
fastening equipment kit for fastening the cabinet to the roof
•
appropriate manuals and guides
•
optional module manuals
•
delivery specific circuit diagrams
•
delivery specific dimensional drawings
•
delivery specific test reports
•
delivery documents.
Lead-through frame and sealing modules (if ordered) are located in the cubicles they are
to be installed in.
Check that there are no signs of damage. Before attempting installation and operation,
check the information on the type designation label of the converter to verify that the unit is
of correct type. The label includes IEC and UL rating, type code and serial number that
allow the identification of each unit. For further information, see section
Summary of Contents for ACS800-67LC
Page 1: ... ABB WIND TURBINE CONVERTERS ACS800 67LC wind turbine converters Hardware manual ...
Page 4: ......
Page 16: ...16 Safety instructions ...
Page 22: ...22 Introduction to the manual ...
Page 42: ...42 Operation principle and hardware description ...
Page 52: ...52 Mechanical installation ...
Page 79: ...Electrical installation 79 3 3 Rotor side cable connection terminals U2 V2 W2 ...
Page 92: ...92 Maintenance 4 6 5 5 ...
Page 103: ...Maintenance 103 Bussmann fuses Mersen fuses ...
Page 109: ...Maintenance 109 5 6 7 ...
Page 131: ...Technical data 131 Declaration of incorporation ...
Page 136: ...136 Dimension drawings ACS800 67LC 1075 0575 7 and 1375 0575 7 ...
Page 137: ...Dimension drawings 137 With 400 mm wide incoming cubicle option C111 ...
Page 138: ...138 Dimension drawings ACS800 67LC 1375 1125 7 ...
Page 139: ...Dimension drawings 139 With 400 mm wide incoming cubicle option C111 ...
Page 140: ...140 Dimension drawings ACS800 67LC 1595 0865 7 and 2035 1125 7 ...
Page 141: ...Dimension drawings 141 With 400 mm wide incoming cubicle option C111 ...
Page 143: ...Dimension drawings 143 Options 2H370 and C111 Option 1H371 ...
Page 144: ...144 Dimension drawings Options 1H371 and C111 Options 2H371 and C111 ...
Page 145: ...Dimension drawings 145 Option H378 Options H378 and C111 ...
Page 147: ...Dimension drawings 147 Option 2H372 ...
Page 148: ...148 Dimension drawings Option 3H372 ...
Page 149: ...Dimension drawings 149 Option 1H373 ...
Page 150: ...150 Dimension drawings Option 2H373 ...
Page 151: ...Dimension drawings 151 Option 3H373 ...