14 Safety instructions
Work with an installation stand and lifting
Note:
The installation stand is not included as standard in the delivery. Please contact
local ABB representative for further inquires regarding installation stand.
WARNING!
•
Attach a lifting chain to the front of the module before pulling out the entire module
from the cabinet.
•
Ensure that the installation stand legs have been locked in position before moving a
module onto it.
•
Ensure that the lifting chains have been evenly adjusted before lifting the module.
•
Do not go under a lifted module or lift a module over other people.
Work on the liquid cooling system
These instructions are intended for all who are responsible for installation and
maintenance work of the liquid cooling system of the converter. Ignoring these instructions
can cause physical injury or damage to the equipment.
WARNING!
•
Beware of hot liquid. Do not work on the liquid cooling system until the pressure is
lowered down by stopping the pumps. High-pressure warm coolant (6 bar (600 kPa),
over 50 °C (122 °F)) is present in the internal cooling circuit when it is in operation.
•
Before power switch-on, make sure that the internal cooling circuit is filled up with
appropriate coolant. Running the pump dry will damage it. Also the converter will not
cool down.
•
Avoid skin contact with coolant, especially antifreeze. Do not syphon them by mouth. If
such substance is swallowed or gets into the eyes, seek medical advice.
•
Do not overtighten the outer union of the nuts of the liquid hoses -
leave 2…3 mm (0.08…0.1 in.) of thread visible. Overtightening will
break the hose.
•
Drain the unit before storing in temperatures below 0 °C (32 °F).
Freezing of the liquid cooling system is not allowed. Add antifreeze and corrosion
inhibitors to the cooling liquid. Operation at liquid temperatures below 5 °C (41 °F) is
not permitted, not even with antifreeze.
2 mm
Summary of Contents for ACS800-67LC
Page 1: ... ABB WIND TURBINE CONVERTERS ACS800 67LC wind turbine converters Hardware manual ...
Page 4: ......
Page 16: ...16 Safety instructions ...
Page 22: ...22 Introduction to the manual ...
Page 42: ...42 Operation principle and hardware description ...
Page 52: ...52 Mechanical installation ...
Page 79: ...Electrical installation 79 3 3 Rotor side cable connection terminals U2 V2 W2 ...
Page 92: ...92 Maintenance 4 6 5 5 ...
Page 103: ...Maintenance 103 Bussmann fuses Mersen fuses ...
Page 109: ...Maintenance 109 5 6 7 ...
Page 131: ...Technical data 131 Declaration of incorporation ...
Page 136: ...136 Dimension drawings ACS800 67LC 1075 0575 7 and 1375 0575 7 ...
Page 137: ...Dimension drawings 137 With 400 mm wide incoming cubicle option C111 ...
Page 138: ...138 Dimension drawings ACS800 67LC 1375 1125 7 ...
Page 139: ...Dimension drawings 139 With 400 mm wide incoming cubicle option C111 ...
Page 140: ...140 Dimension drawings ACS800 67LC 1595 0865 7 and 2035 1125 7 ...
Page 141: ...Dimension drawings 141 With 400 mm wide incoming cubicle option C111 ...
Page 143: ...Dimension drawings 143 Options 2H370 and C111 Option 1H371 ...
Page 144: ...144 Dimension drawings Options 1H371 and C111 Options 2H371 and C111 ...
Page 145: ...Dimension drawings 145 Option H378 Options H378 and C111 ...
Page 147: ...Dimension drawings 147 Option 2H372 ...
Page 148: ...148 Dimension drawings Option 3H372 ...
Page 149: ...Dimension drawings 149 Option 1H373 ...
Page 150: ...150 Dimension drawings Option 2H373 ...
Page 151: ...Dimension drawings 151 Option 3H373 ...