Electrical installation 61
6
Electrical installation
Contents of this chapter
The chapter describes how to check the insulation of the installation and the
compatibility with IT (ungrounded) and corner-grounded TN systems. It shows how to
connect the power and control cables, install optional modules and connect a PC.
Warnings
WARNING!
Obey the instructions in
on page
. If you
ignore them, injury or death, or damage to the equipment can occur.
WARNING!
Make sure that the drive is disconnected from the input power
during installation. Before you do work on the drive, wait for 5 minutes after you
disconnect the input power.
Required tools
To perform the electrical installation, you need the following tools:
• Wire stripper
• Screwdriver or wrench with a set of suitable bits
• Multimeter and voltage detector
• Personal protective equipment
Summary of Contents for ACS380 Series
Page 1: ...ABB MACHINERY DRIVES ACS380 drives Hardware manual...
Page 4: ......
Page 12: ...12 Table of contents...
Page 20: ...20 Safety instructions...
Page 46: ...46 Mechanical installation...
Page 60: ...60 Planning the electrical installation...
Page 86: ...86 Maintenance...
Page 120: ...120 Technical data...
Page 122: ...122 Dimension drawings Frame R0 1 phase 230 V...
Page 123: ...Dimension drawings 123 Frame R0 400 V...
Page 124: ...124 Dimension drawings Frame R1 230 V...
Page 125: ...Dimension drawings 125 Frame R1 3 phase 230 V and 3 phase 400 V...
Page 126: ...126 Dimension drawings Frame R2 230 V...
Page 127: ...Dimension drawings 127 Frame R2 400 V...
Page 128: ...128 Dimension drawings Frame R3 400 V...
Page 129: ...Dimension drawings 129 Frame R4 400 V...
Page 130: ...130 Dimension drawings...
Page 138: ...138 Resistor braking...
Page 169: ...BTAC 02 pulse encoder interface module 169 Dimensions 3AXD50000031154 rev A...