Installation checklist 59
7
Installation checklist
What this chapter contains
This chapter contains a list for checking the mechanical and electrical installation of
the drive.
Checking the installation
Check the mechanical and electrical installation of the drive before start-up. Go
through the checklist below together with another person. Read chapter
of this manual before you work on the drive.
Check
MECHANICAL INSTALLATION
The ambient operating conditions are within allowed limits. (See
Checking the installation site
as well as
:
on page
and
on page
.)
The drive is fixed properly on an even vertical non-flammable wall. (See
on page
33.
)
The cooling air will flow freely. (See
:
on page
.)
The motor and the driven equipment are ready for start. (See
Checking the compatibility of the motor and drive
on page
as well as
on page
.)
ELECTRICAL INSTALLATION
(See
Planning the electrical installation
on page
and
on page
)
For ungrounded and corner-grounded systems: The internal EMC filter is disconnected
(EMC screw removed).
The capacitors are reformed if the drive has been stored over a year.
Summary of Contents for ACS355 series
Page 1: ...ABB machinery drives User s manual ACS355 drives ...
Page 4: ......
Page 16: ...16 ...
Page 32: ...32 Operation principle and hardware description ...
Page 58: ...58 Electrical installation ...
Page 74: ...74 Start up control with I O and ID run ...
Page 106: ...106 Control panels ...
Page 120: ...120 Application macros ...
Page 178: ...178 Program features ...
Page 338: ...338 Fieldbus control with embedded fieldbus ...
Page 368: ...368 Fault tracing ...
Page 404: ...404 Dimension drawings ...
Page 410: ...410 Appendix Resistor braking ...
Page 434: ...434 Appendix Permanent magnet synchronous motors PMSMs ...