6.11 Control and power supply
cables for fan units
DTL fan units
(In drives with DTL operation only)
Connect the
power supply cable
of
the fan unit to the termi-
nals inside the corresponding terminal box (see
picture below).
Standard fan units
1. Pull the control and power supply cables
through the rear cable entry located in the floor
of the fan unit (see picture below).
2. Route the cables through the fan cable entry on
the cabinet roof and connect them to the
appropriate terminals inside the cabinet.
Note: The control and power supply cables are
already prepared in the factory for connection.
!
For information on connection details,
see the applicable
Wiring diagrams
.
Summary of Contents for ACS2000 AFE 1MVA
Page 6: ...170 Replacing filter mats 171 Phase modules location 171 Phase module Dimensions and weight ...
Page 8: ...Terms trademarks related documentation ...
Page 13: ...13 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 14: ...General information on manual and drive ...
Page 19: ...19 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 20: ...Important note on main circuit breaker ...
Page 48: ...Chapter 3 Control system 49 Overview 50 Main components 54 I O interfaces ...
Page 67: ...67 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 77: ...77 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 83: ...83 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J 5 1 3 2 1 4 A B C E D ...
Page 85: ...85 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 113: ...113 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 114: ...Commissioning check list ...
Page 149: ...149 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 176: ......