Start-up including validation test
To ensure the safe operation of a safety function, validation is required. The final
assembler of the machine must validate the function by performing a validation
test. The test must be performed
1.
at initial start-up of the safety function
2.
after any changes related to the safety function (circuit boards, wiring,
components, settings, replacement of inverter module, etc.)
3.
after any maintenance work related to the safety function
4. after a drive firmware update
5. at the proof test of the safety function.
■
Competence
The validation test of the safety function must be carried out by a competent
person with adequate expertise and knowledge of the safety function as well as
functional safety, as required by IEC 61508-1 clause 6. The test procedures and
report must be documented and signed by this person.
■
Validation test reports
Signed validation test reports must be stored in the logbook of the machine. The
report shall include documentation of start-up activities and test results, references
to failure reports and resolution of failures. Any new validation tests performed
due to changes or maintenance shall be logged into the logbook.
■
Validation test procedure
After wiring the Safe torque off function, validate its operation as follows.
Action
WARNING!
Obey the safety instructions. If you ignore them, injury or death, or damage to
the equipment can occur.
Make sure that the motor can be run and stopped freely during start-up.
Stop the drive (if running), switch the input power off and isolate the drive from the
power line using a disconnector.
Check the STO circuit connections against the wiring diagram.
Close the disconnector and switch the power on.
170 The Safe torque off function
Summary of Contents for ACS180-04S-03A7-1
Page 1: ...ABB MACHINERY DRIVES ACS180 drives Hardware manual...
Page 2: ......
Page 4: ......
Page 12: ...12...
Page 24: ...24...
Page 84: ...84...
Page 96: ...96...
Page 146: ...146...
Page 148: ...Frame R0 148 Dimension drawings...
Page 149: ...Frame R1 Dimension drawings 149...
Page 151: ...Frame R3 Dimension drawings 151...
Page 152: ...Frame R4 152 Dimension drawings...
Page 160: ...160...
Page 180: ...Declarations of conformity 180 The Safe torque off function...
Page 181: ...The Safe torque off function 181...
Page 182: ...182 The Safe torque off function...
Page 183: ...The Safe torque off function 183...
Page 184: ...184...
Page 187: ...Installation 1 2 N m M4x16 2x 3 3 3 2 2 2 2 Accessories 187...
Page 189: ...Installation 3 3 2 2 2 3 2 2 N m M4x16 4x 1 Accessories 189...