02 IMPORTANT SAFETY INFORMATION
3BHS206977 E01 REV H
ACS1000I AIR-COOLED
USER MANUAL
2.4
Product safety labels
Safety labels are affixed to the drive components to alert personnel of potential hazards when
working on the equipment. For more information, see the label placement document for
the drive.
The instructions on the safety labels must always be followed and the labels must be kept in a
perfectly legible condition.
Figure 2-1: Product warning label examples (label placement depends on the drive)
Additional safety labels, including the following, might also be provided:
(1) Danger label
(2) Caution label
(3) Warning label
(4) Notice label
Electricity hazard
This sign can also have additional text below it, eg, “High voltage”
Hot surface
Crushing of hands
No access for people with active implanted cardiac device
The magnetic field of the drive can influence the functioning of pacemakers. The
pacemaker sign should be installed at the entrance to the drive room or at a
minimum distance of 6 m from the drive to stop personnel with pacemakers
approaching the drive.
Firefighting sign
Outlines the procedure when fighting fire in electrical equipment. The sign must
be installed well visible near the drive.
High voltage sign
Must be installed clearly visible at the main circuit breaker in the switchgear room.
The sign alerts personnel to the high voltage which can be present on the
secondary side of the input transformer until the main circuit breaker has been
opened and secured and the drive has been de-energized and grounded.
1
2
3
4
Summary of Contents for ACS1000i air-cooled
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000i air cooled User manual ...
Page 3: ...Contents ACS1000i air cooled User manual ...
Page 5: ... 01 About this manual 01 5 16 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 17 28 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 29 56 ...
Page 57: ... 04 Control system 04 57 70 ...
Page 71: ... 05 Transportation storage and disposal05 71 78 ...
Page 78: ......
Page 79: ... 06 Mechanical installation 06 79 88 ...
Page 88: ......
Page 89: ... 07 Electrical installation07 89 104 ...
Page 105: ... 08 Commissioning 08 105 110 ...
Page 110: ......
Page 111: ... 09 Operation 09 111 124 ...
Page 125: ... 10 CDP control panel 10 125 148 ...
Page 149: ... 11 Preventive and corrective maintenance 11 149 172 ...
Page 173: ......