The contacts of the switch or relay must open/close within 200 ms of each other.
■
Cable types and lengths
•
Double-shielded twisted-pair cable is recommended.
•
Maximum cable lengths:
•
Frames R0…R2: 100 m (330 ft) between activation switch [K] and drive control
board
-
-
Frames R3…R8: 300 m (1000 ft) between activation switch [K] and drive control
board
•
60 m (200 ft) between external power supply and control board
Note:
A short-circuit in the wiring between the switch and an STO terminal causes a dangerous
fault. Therefore, it is recommended to use a safety relay (including wiring diagnostics) or a
wiring method (shield grounding, channel separation) which reduces or eliminates the risk
caused by the short-circuit.
Note:
The voltage at the STO input terminals of the drive must be at least 13 V DC to be interpreted
as “1”.
The pulse tolerance of the input channels is 1 ms.
■
Grounding of protective shields
•
Ground the shield in the cabling between the activation switch and the control board at
the control board only.
•
Ground the shield in the cabling between two control boards at one control board only.
The Safe torque off function 153
Summary of Contents for ACQ80-04 Series
Page 1: ...ABB DRIVES FOR WATER ACQ80 04 drives 0 75 to 160 kW 1 0 to 215 hp Hardware manual...
Page 2: ......
Page 4: ......
Page 18: ...18...
Page 24: ...24...
Page 38: ...38...
Page 50: ...50...
Page 64: ...64...
Page 98: ...98...
Page 110: ...110...
Page 140: ...Frame R3 IP20 140 Dimension drawings...
Page 146: ...146...
Page 162: ...162...
Page 168: ......