Start-up
Contents of this chapter
This chapter describes the start-up procedure of the drive.
Start-up procedure
1. Only qualified electrical professionals are allowed to start-up the drive.
2. Make sure that the installation of the drive module has been checked according to the
checklist in chapter
Installation checklist
, and that the motor and driven equipment are
ready for start.
3. Perform the start-up tasks instructed by the cabinet-installer of the drive module.
4. Switch the power on, setup the drive control program, and perform the first start of the
drive and motor. See ACQ580 pump control program quick startup guide
(3AXD50000048773 [English]) or
ACQ580 pump control program firmware manual
(3AXD50000035867 [English])
5. For drive modules in which the Safe torque off function is in use: Test and validate the
operation of the Safe torque off function. See
Validation test procedure (page 201)
13
Start-up 143
12
Summary of Contents for ACQ580-34
Page 1: ... ABB DRIVES FOR WATER ACQ580 34 drive modules Hardware manual ...
Page 2: ......
Page 4: ......
Page 14: ...14 ...
Page 24: ...24 ...
Page 50: ...50 ...
Page 60: ...60 ...
Page 70: ...70 ...
Page 94: ...94 ...
Page 110: ...110 ...
Page 122: ...122 ...
Page 132: ...Dimension drawing 132 External control unit option P906 ...
Page 140: ...140 ...
Page 144: ...144 ...
Page 164: ...164 ...
Page 184: ...Standard configuration E208 and E210 included 184 Dimension drawings ...
Page 185: ...Drive module with option B051 Dimension drawings 185 ...
Page 186: ...Drive module with options B051 H370 186 Dimension drawings ...
Page 187: ...LCL filter module Dimension drawings 187 ...
Page 190: ...190 ...
Page 208: ... Declaration of conformity 208 The Safe torque off function ...
Page 214: ...214 ...
Page 226: ...226 ...