ACS 600 MultiDrive
4-1
Chapter 4 – Installation Checklist
Installation Checklist
The mechanical and electrical installation of ACS 600 MultiDrive
should be checked before start-up. It is advisable to go through the
checklist below together with another person. Study carefully the
Safety Instructions on the first pages of this manual before attempting
any work on, or with, the unit.
INSTALLATION CHECKLIST
Check
MECHANICAL INSTALLATION
The ambient operating conditions are acceptable. (See
Safety and Product Information:
environmental limits, cooling air flow requirements, free space requirements
)
The unit is fixed properly. (See
Chapter 2 – Mechanical Installation
)
Cooling air will flow freely:
• the lifting bars (if used) are removed. (See
Chapter 2 – Mechanical Installation
)
• the cabinet roof is lifted up (if double roof). (See
Chapter 2 – Mechanical Installation
)
The applicability of the motor and the driven equipment. (See
Safety and Product
Information: Motor Connection
)
ELECTRICAL INSTALLATION
(see
Chapter 3 – Electrical Installation
)
Joining of the shipping splits:
• The DC busbars and PE busbars are properly connected (See
Chapter 2 – Mechanical
Installation: Connecting the DC Busbar and the PE Busbar
)
• The control cables are properly connected. (See
Chapter 3 – Electrical Installation:
Control Cable Connection at Shipping Split Joints
)
The converter unit is earthed properly.
The mains voltage matches the frequency converter nominal input voltage.
The setting of the internal 220/115 V transformer corresponds to the supply voltage. The
transformer is located in the Auxiliary Control Unit.
The mains (input power) connections at U1, V1 and W1 are OK.
Summary of Contents for ACA 6 Series
Page 4: ......
Page 8: ...Safety Instructions vi ACS 600 MultiDrive ...
Page 12: ...x ACS 600 MultiDrive Hardware Manual ...
Page 26: ...Chapter 1 Introduction 1 14 ACS 600 MultiDrive Hardware Manual ...
Page 100: ...Chapter 6 Preventive Maintenance 6 6 ACS 600 MultiDrive ...
Page 101: ......