Section 4 Operation
Start Modes
3BSE 027 941 R301
113
Cold Restart
The application program restarts. Variable values are initialized unless marked Cold
retain.
To initiate a cold restart, the Controller must be restarted by briefly pressing
the INIT push button (less than 2.5 seconds).
Cold Restart in Redundant Configuration
To restart CPUs running in redundant configuration:
1.
Perform a Controller Reset of the backup CPU (see below). The system will go
into single CPU state.
2.
Wait a few seconds and then restart the Primary CPU by pressing the INIT push
button less than 2.5 seconds.
3.
The system will be upgraded to synchronized CPU state once again.
Controller Reset
The system stops. The application program and variables are erased.
To initiate Controller Reset, press and hold the Controller INIT push button (more
than three seconds) until the Run LED begins to flash. A Controller Reset must be
performed if the system is in an undefined position and consequently unavailable to
the user.
Controller Reset in Redundant Configuration
Follow the steps below to perform a Controller Reset in redundant configuration:
1.
Perform a Controller Reset of the backup CPU. The system will go single CPU
state.
2.
Wait a few seconds and then perform a Controller Reset on the Primary CPU.
Summary of Contents for AC 800M
Page 1: ...ControlIT AC 800M Version 2 1 Controller Hardware Hardware and Operation...
Page 2: ......
Page 3: ...Controller Hardware Hardware and Operation ControlIT AC 800M Version 2 1...
Page 10: ...7DEOH RI RQWHQWV 10 3BSE 027 941 R301...
Page 20: ...Related Documentation About This Book 20 3BSE 027 941 R301...
Page 26: ...Operating Environment Safety Summary 26 3BSE 027 941 R301...
Page 42: ...Product Release History Section 1 Introduction 42 3BSE 027 941 R301...
Page 108: ...Powering from an External 24 V DC Source Section 3 Configuration 108 3BSE 027 941 R301...
Page 118: ...Verification of Redundant CPU Section 4 Operation 118 3BSE 027 941 R301...
Page 212: ...Low Voltage Directive LVD Appendix D Directive Considerations 212 3BSE 027 941 R301...
Page 214: ...Hazardous Location Approval Appendix E Standards 214 3BSE 027 941 R301...
Page 228: ...QGH 228 3BSE 027 941 R301...
Page 229: ......