Operation Manual / 4 Product description / A130-M.. - A145-M..
6 Periodic maintenance work / 6.3 Cleaning the turbine during opera-
tion
© Copyright 2017 ABB. All rights reserved.
HZTL4031_EN
Revision F
August 2017
Fig. 23: Carrying out wet cleaning of turbines
u
Fulfil prerequisites.
u
Ensure that the water supply (01) is guaranteed.
u
Open the stop valve (02) and set the water volume flow V
W
with a flowmeter (03) (see
cleaning parameters).
u
Close the stop valve (02) after 10 minutes.
u
Wait for 10 minutes; do not change the load during this stabilisation phase.
If the cleaning result is unsatisfactory or there is water leakage, contact an ABB Turbochar-
ging Service Station.
Product
Temperature be-
fore turbine before
cleaning [°C]
Maximum temper-
ature before tur-
bine during clean-
ing [°C]
Water volume flow
V
W
[dm
3
/min]
1)
Injection time
[min]
A130
350 ... 430
530
4.0
10
A135
350 ... 430
530
5.5
10
A140
350 ... 430
530
8.5
10
A145
350 ... 430
530
12.0
10
Table 14: Wet cleaning of turbines, parameters
1)
Corresponds to a water pressure p
WT
of 1.5 bar (overpressure compared to atmosphere)
Page
48
/