Operation Manual / A200-L
7 Periodic maintenance / 7.5 Cleaning the turbine during operation
© Copyright 2021 ABB. All rights reserved.
HZTL4036_EN
Rev.T
December 2021
7.5.2
Procedure for dry cleaning the turbine
Dry cleaning device
Fig. 23: Dry cleaning device
11
Granulate container (51702)
16
Protection valve [closed] (51713)
12
Cover cap (51703)
17
Pressurised air valve [venting] (51704)
13
Pressurised air supply [4 ... 7 bar]
18
Plate
14
Piping
19
Cleaning instructions (51717)
15
On-Off valve [closed] (51705)
20
Gas inlet casing, insulated
CAUTION
Protecting the pressurised air system
u
Protect the pressurised air system against overpressure (> 7 bar).
Page
59
/
145