
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
71
7.3 Re-packing of the bushing
Overview
G006949
Procedure
1.
Put plastic wrap on the draw rod, and fix it to the transport box.
CAUTION!
Do not put the draw rod into the bushing, the threads on the draw rod will scratch the inside
of the center-tube.
2.
Put plastic wrap on the upper draw rod and the support tubes.
3.
Lift the bushing. Refer to
Lifting the bushing out of the transport box,
page
4.
Lower the bushing into the transport box.
CAUTION!
Make sure that the support blocks are in the correct positions in the transport box.
CAUTION!
Make sure that the oil valve and test tap does not make contact with the transport box, or
other objects.
Summary of Contents for 1ZSC902110-AAA
Page 12: ...12 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 18: ...18 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 78: ...78 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 82: ...82 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...