Installing MX-ONE
1/BYB 501 180 Cabinet Frame
Pos. Title/Function
Product Number
Quantity
EARTHING PLATE
SXA 123 0760/1
4
SCREW M 4X8
24/SBF 228 040/0080
8
PUSH-BUTTON
SKY 117 01/4
2
SCREW 3.5X9.5
SBF 131 279/24
2
ESD WRISTSTRAP
LYB 250 01/141
1
LABEL
SVB 129 16
1
MARKING LABEL
2/SVF 191 040/2
1
MARKING PLATE2
SVF 191 131/1
1
4.2.4
Positioning the Cabinet
1.
Make sure that holes for tip protection or earthquake bracing frame have
been drilled.
If not use the rack and the tip protection or the earthquake bracing frame as
a template.
2.
Position the cabinet in line with other cabinets and the site walls, see the
environmental spec for MX-ONE SITE PLANNING.
4.2.5
Leveling the Cabinet
Figure 15
Leveling the Cabinet
28
6/1531-ASP 113 01 Uen J2 2008-07-17
Summary of Contents for MX-ONE
Page 1: ...Installing MX ONE INSTALLATION INSTRUCTIONS...
Page 6: ...Installing MX ONE 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 10: ...Installing MX ONE Figure 1 MX ONE Cabinets 4 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 26: ...Installing MX ONE 20 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 72: ...Installing MX ONE Figure 49 Installing Slides 66 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 107: ...Cabling Figure 79 Cable Connections Configure Example 101 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 111: ...Cabling Figure 81 ESU Front Connectors and LEDs 105 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 122: ...Installing MX ONE 116 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 134: ...Installing MX ONE 128 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 146: ...Installing MX ONE 140 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 148: ...Installing MX ONE 142 6 1531 ASP 113 01 Uen J2 2008 07 17...
Page 156: ...Installing MX ONE 150 6 1531 ASP 113 01 Uen J2 2008 07 17...