26
Aarrow Sherborne GSL CF
SERVICING
Step 7
Clear inside of stove of any debris.
Step 8
To re-assemble reverse this procedure. See
initial note on page 25.
Note:
When relocating the body and canopy
assembly ensure the front location tab is engaged
in the chassis.
BURNER AND VALVE
ASSEMBLY REMOVAL
Please note! When handling the burner assembly
be aware of the sharp points of the self tapping
screws on the underside
Ensure the appliance is cold.
Step 1
Isolate the gas supply from the stove
Step 2
Disconnect the supply inlet pipe by
releasing the pipe nut at the rear of the
valve, see page 13.
Step 3
Remove the outer body of the stove (Ref
Page 25).
Step 4
Remove the dummy fuel retainer and then
the glass frame assembly (Ref Page 25).
Step 5
Remove the coals or logs.
Step 6
Remove the base coal matrix (four pieces)
Take care not to damage the matrix,
(Page 14).
Step 7
Remove the two self tapping screws each
side of the injector as shown below.
The burner assembly may now be
removed. Slide back off the injector and
lift the burner assembly upwards from the
rear while at the same time pivoting it
towards you. Take care not to damage the
injector.
Step 8
To remove the valve assembly undo the
3x Pozi M5 screws, located within the fire
box (2x to the front of the burner and 1x
centrually to the rear of the burner), lift
upwards from the rear while at the same
time pivoting it towards you. Carefully
guide the controls through aperture clear
of the stove.
After replacement of burner assembly, ensure
that a check on the gas tightness of any new
joint is carried out.