101
RZ Series Startup Form
Date:______________
Job Name:_____________________________________________________________________
Job Address:____________________________________________________________________
______________________________________________________________________________
Model Number:_________________________________________________________________
Serial Number:_____________________________________________
Tag:______________
Startup Contractor:______________________________________________________________
Contractor Address:________________________________________
_________________________________________________________
Phone:____________
Pre Startup Checklist
Installing contractor must verify the following items:
1.
Is there any visible shipping damage?
Yes No
2.
Is the unit level?
Yes No
3.
Are the unit clearances adequate for service and operation?
Yes No
4.
Do all access doors open freely and are the handles operational?
Yes No
5.
Have all shipping braces been removed?
Yes No
6.
Have all electrical connections been tested for tightness?
Yes No
7.
Does the electrical service correspond to the unit nameplate?
Yes No
8.
On 208/230V units, has transformer tap been checked?
Yes No
9.
Has overcurrent protection been installed to match the unit nameplate
requirement?
Yes No
10.
Have all set screws on the fans been tightened?
Yes No
11.
Do all fans rotate freely?
Yes No
12.
Is all copper tubing isolated so that it does not rub?
Yes No
13.
Have the damper assemblies been inspected?
Yes No
14.
Are air filters installed with proper orientation?
Yes No
15.
Have condensate drain and p-trap been connected?
Yes No
16.
Has the outside air rain hood been opened?
Yes No
Summary of Contents for RZ Series
Page 2: ......
Page 31: ...31 Figure 4 4 Point Lift RZ Series Air Cooled Condenser Unit ...
Page 90: ...90 Gas Heater Operating Instructions ...
Page 108: ...108 Maintenance Log E Coated Coil ...
Page 110: ...110 ...
Page 111: ......