30
Seismic Curb Installation
Using a standard curb with a seismic unit will
void the certification of the unit. All
mounting details listed must be followed to
achieve seismic certification. The AAON
unit must be certified to ICC-ES AC156
when using a seismic curb for seismic
certifications to apply. Any deviations or
modifications to the unit or curb will void all
seismic certification.
Structural engineer of record must approve
building anchorage to unit or curb in
compliance with OSP-0180-10. Use provided
self tapping screws to attach base of unit to
seismic curb bracket.
Figure 9 - Solid Bottom Seismic Curb with Filters
Summary of Contents for RQ NextGen Series
Page 2: ......
Page 26: ...26 Figure 3 RQ Cabinet Standard and Power Exhaust Gasket Locations...
Page 40: ...40 Figure 23 Post Corner Hole Piping Figure 24 Post Back Hole Piping...
Page 88: ...88 Gas Heater Operating Instructions Figure 36 Gas Heater Instructions...
Page 95: ...95...
Page 96: ...96...
Page 105: ...105 Maintenance Log E Coated Coil...
Page 107: ...107...