29
Vertical Duct Connection
Note:
If outside air will be in contact with the
air tunnel base the unit must include the base
insulation option or the base must be field
insulated.
Figure 8 - Vertical Duct Connection
Do not drill or punch holes in the base
of the unit, from inside the unit or from
below the unit to attach ductwork.
Leaking may occur if unit base is
punctured.
CAUTION