40
Duct Connection
Note:
If outside air will be in contact with the
air tunnel base of an A, B or C cabinet unit
(6-25 and 30 tons), the unit must include the
base insulation option or the base must be
field insulated. D and E cabinet (26 and 31-
140 tons) units include base insulation
standard.
Figure 15 - Duct Connection
Do not drill or punch holes in the base
of the unit, from inside the unit or from
below the unit to attach ductwork.
Leaking may occur if unit base is
punctured.
CAUTION
Summary of Contents for RN Series
Page 2: ......
Page 32: ...32 Figure 5 RN Series 6 8 and 10 ton Unit Isolator Locations ...
Page 33: ...33 Figure 6 RN Series 9 and 11 15 ton Unit Isolator Locations ...
Page 34: ...34 Figure 7 RN Series 16 25 and 30 ton Unit Isolator Locations ...
Page 35: ...35 Figure 8 RN Series 26 31 50 60 and 70 ton Unit Isolator Locations ...
Page 36: ...36 Figure 9 Steel Mounting ...
Page 102: ...102 Figure 56 Example 6 50 60 70 ton through the Base Gas Piping ...
Page 105: ...105 Gas Heater Operating Instructions Figure 58 Gas Heater Instructions ...
Page 129: ...Maintenance Log E Coated Coil ...