3 INSTALLATION
Pag. 12 di 26
10.
Mount the movable frame
D
from the top of the equipment with the aid of bands
appropriately sized to the weight of the equipment (
E
) by an overhead crane or with a hoist
of sufficient capacity (
11.
Replace the lower hook
A
and then tighten the screws that sustain it (
Picture 5
Picture 6