
R-30 RM
2.2. Installation procedure
1.
Install the valve as indicated by the arrow on the valve bonnet, indicating flow direction [
1
].
2.
In addition of the control valve it is recommended to install the following valves:
Isolation valves upstream and downstream of the control valve [
2
].
Air valves upstream and downstream of the control valve [5].
Quick pressure relive valve downstream of the control valve [6].
3.
Close the
2
-way outlet ball valve [3B], and turn on the water supply to the valve.
4.
Check for leaks; tighten bolts & fittings, if necessary.
5.
Turn the adjusting screw [
4
A] counter-clockwise until there is no pressure on the spring.
6.
Close the
2
isolation valves [
2
].
Summary of Contents for Eliptix R-30RM
Page 19: ...R 30 RM 7 DIMENSIONAL DRAWING ...