A.R.I. Eliptix R-30 SRM 3W Installation, Operating, Maintenance Download Page 14

R-30 SRM 

 

 

 

 

 

 

 

5. TROUBLESHOOTING

 

 

 

 

Problem 

Cause 

Check 

Solution 

Valve does not open 

1.

 

The Inlet pressure is 
too low 

1.

 

Check the inlet 
pressure 

 

1.

 

 Make sure that the water supply 
(or the pump) is on. 

2.

 

The 

3

-Way selector 

(

3

) is set to "close". 

2.

 

Check the position of 
the 3-way selector (

3

2.

 

 Turn the 

3

-Way selector (

3

) to 

"auto". 

3.

 

Blocked pilot 

3.

 

No water coming out 
of the pilot #

2

 port. 

3.

 

 Contact  A.R.I.’s field service 

 

4.

 

pre-set pressure of 
the SU pilot is too 
high 

4.

 

 

4.

 

 Readjust the SU pilot pressure as 
described in the Initial Set-up 
chapter (

2.4

). 

Valve does not close 

1.

 

Debris on the sealing 
seat 

1.

 

The valve is constantly 
discharging small 
amount of water 

1.

 

  Turn the 

3

-way selector (

3

) to 

"open" for 

5

 seconds, and then to 

"close". 
If the problem continues, turn off 
the water supply to the valve.  
Remove the bonnet and 
diaphragm, remove the foreign 
object, and check that the 
diaphragm, body and cover are not 
damaged. 

2.

 

The diaphragm is 
damaged 

2.

 

The valve is constantly 
discharging small 
amount of water 

2.

 

 Turn off the water supply to the 
valve.  Remove the bonnet and 
replace the diaphragm. 

3.

 

The 

3

-Way selector is 

in the "open" 
position. 

3.

 

Check the 

3

-way 

selector. 

3.

 

 T urn the 

3

-Way selector (

3

) to 

"auto" or "close" position 

4.

 

Blocked self-flushing 
filter (

2

). 

4.

 

Disconnect the 
control tube from the 
self-flushing filter (

2

and check for free 
water flow. 

4.

 

 Turn off the water supply to the 
valve, remove the finger-filter and 
clean or replace it. 

Unstable downstream 
pressure  

Blocked or damaged 
pilot 

Unstable pressure 
downstream of the 
valve 

Contact A.R.I.'s field service  

Incorrect but stable 
downstream pressure 

Wrong preset pressure 

 

Readjust the downstream pressure 
as described in the Initial Set-up 
chapter (

2.4

).  

 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for Eliptix R-30 SRM 3W

Page 1: ...cape and infrastructure applications The R 30 series has an innovative elliptic shaped diaphragm that integrates well with a wide variety of regulating control pilots solenoids and control accessories...

Page 2: ...n 6 2 INSTALLATION 7 2 1 Pre installation requisites 7 2 2 Installation procedure 8 2 3 Initial Start up The Control Valve 9 2 4 Initial Set up The Pressure Reducing and Sustaining Application 10 3 OP...

Page 3: ...oever whether caused by accessing and or relying upon this Disclaimer and or in any document enclosed hereto including without limitation any links procedures or materials A R I shall NOT assume any l...

Page 4: ...prior warning Make sure that allproducts outlet portsarenotdirectedtowardelectricalelements pumps orpeople 8 Always open and close valves slowly and gradually 9 Please note that the maximum working pr...

Page 5: ...ulations set for handling this type of fluid 3 Before disconnecting the product from the system and before releasing the residual pressure do NOT loosen or unscrew the product bolts removeanyprotectio...

Page 6: ...ons 2 Make sure that all the tools ladders lifting devices etc used during the maintenance procedures are taken away from the product area and stored 3 Remove grease and fat material residues in order...

Page 7: ...Before installing the valve flush the pipeline to remove scale dirt and other particles that might affect the valve performance 3 Carefully remove the valve from the shipping package Unload all the va...

Page 8: ...f the control valve 12 12a Air valves upstream and downstream of the control valve 15 Quick pressure relive valve downstream of the control valve 16 3 Turn the 3 way manual selector ball valve 3 to Cl...

Page 9: ...2a slowly clockwise one turn at a time Wait few seconds between turns allowing the valve to react until the downstream pressure reaches the required level water starts to flow to the pipeline 7 Gradu...

Page 10: ...ontrol chamber by letting water enter the control chamber through its port 4 causing the valve s diaphragm to slightly close and decrease the downstream pressure back to the required settings level Wh...

Page 11: ...e set level When the upstream pressure drops below the setting the valve closes Pipeline water flows constantly through the control loop The pilot senses the upstream pressure through its 1 port When...

Page 12: ...ease note By doing so you will have no control over the downstream pressure it is possible that your system will be exposed to excessive pressure 2 To manually close the valve turn the manual 3 way se...

Page 13: ...ally inspect the valve s diaphragm for any tears 2 Every 12 months inspect the valve s operation and clean the Finger Filter 3 Check the downstream pressure adjust if required 4 2 Storing the valve It...

Page 14: ...off the water supply to the valve Remove the bonnet and diaphragm remove the foreign object and check that the diaphragm body and cover are not damaged 2 The diaphragm is damaged 2 The valve is consta...

Page 15: ...R 30 SRM 6 DIMENSIONAL DRAWING...

Page 16: ...ble nor does this warranty extended to any consequential or incidental damages or expenses of any kind or nature regardless of the nature thereof including without limitation injury to persons or prop...

Reviews: