4.3.7
Adding times to a week program
Call up the menu to INSERT switch-on and switch-off times into a week program as
follows:
[
]: WEEK PROGRAM | PROGRAM OVERVIEW.
Confirm with [ENTER].
The display shows the menu for the week program. The cursor points to the active
period.
Scroll [ ] to INSERT.
Confirm with [ENTER].
The submenu for adding a period will appear.
Example
As an example, we will program an extra period in which the switch-on time is set to
18:00 and the corresponding switch-off time to 22:00. The water temperature will be set
to 75ºC and the pump will run continuously.
Proceed as follows:
Set the switch-on time (see section 4.3.6.1).
Set the switch-off time (see section 4.3.6.2).
Set the water temperature (see section 4.3.6.3).
Set the program-controlled pump (see section 4.3.6.4).
To activate the week program with the new period added, scroll down with [ ] to
START OPERATION and confirm with [ENTER].
1.
2.
3.
a.
b.
c.
d.
4.
0311753_SGS_28-120_II_UKUK_V2.0 , 2017-05-03
33
Summary of Contents for BFC-120
Page 6: ...6...
Page 13: ...User part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 13...
Page 14: ...14...
Page 16: ...16 User part...
Page 18: ...18 User part...
Page 24: ...24 User part...
Page 40: ...40 User part...
Page 41: ...Installation Maintenance and Service part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 41...
Page 42: ...42 User part...
Page 82: ...82 Installation Maintenance and Service part...
Page 90: ...90 Installation Maintenance and Service part...
Page 104: ...104 Installation Maintenance and Service part...
Page 110: ...Fig Dimensions SGS 28 30 50 60 110 Installation Maintenance and Service part...
Page 112: ...Fig Dimensions SGS 80 100 120 112 Installation Maintenance and Service part...
Page 121: ...12 8 Declaration of conformity 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 121...
Page 124: ...124 Installation Maintenance and Service part...
Page 126: ...126 Installation Maintenance and Service part...