A. & H. Meyer Sdn Bhd (528797-M)
No. 3, Jalan Astaka U8/84
Section U8, Bukit Jelutong
40150 Shah Alam, Selangor
Malaysia
T: +603 7845 7277
F: +603 7845 2155
W: www.ah-meyer.com.my
NETBOX
Profilebox Sub
4. Secure cable and insert into power
source. Product is ready to use.
Push the Profilebox Sub towards left or
right to lock into position. Ensure the
bracket is fully inserted to the mushroom.
Use a mallet to knock if necessary.
3.
2. Place the Profilebox Sub on the
mushroom bracket.
Define the location and mark the screw holes
(refer backpage’s measurement table, “B”).
Mount the mushroom bracket using the screw.
1.
Part List
NETBOX Profilebox Sub x 1
Profilebox Sub Mushroom x 2
Flat Head Screw #8x1inch x 2
Installation Guide
For dimensions
Please refer to the back.